South Bank Wharf

Empty wharf with stainless steel railings

Brisbane City Council aimed to upgrade the South Bank Ferry terminals to create a dual berth terminal for the CityCat and CityHopper services.

Steelpipes was fortunate enough to supply the epoxy-coated, long-length piles with pile shoe fabrication sourced from overseas mill partners, arriving in Brisbane Port and unloaded directly onto our customer’s barge.

  • Various lengths | 800 x 16mm
  • 36 x lengths | 253tn
  • Project date: September 2021

Gallery

Wharf with steel railings and a large long pipes for the foundation
Berth with steel pipe supports
Two long large steel pipes supporting a platform

Need steel pipes?
We can supply anywhere
in Australia or
New Zealand.

Get in touch for quality products, friendly service and
exceptional value.